Hampton-Rochester-La
Crosse 345 kV transmission line project route
options
A Route Permit application
for the Hampton-Rochester-La Crosse project was filed
with the Minnesota Public Utilities Commission on
January 19, 2010.
During the Minnesota Office of Energy (OES) public
scoping period in spring 2010, many comments were
received from the public and local government officials.
In response, the OES revised the scope of its Environmental
Impact Study (EIS) to include 46 route alternatives
and 12 route alignments. These additional routes
will be studied along with the routes presented in
the Route Permit application filed by CapX2020. The
map below shows both the CapX2020 routes and the
recently added OES routes.
Detailed aerial photos route maps: Click within a
tile below to download a detailed tile map as a PDF.
Click outside the tiles for a larger view of the
entire project map. Click here for a high resolution
PDF of the project map.
|