Bemidji-Grand Rapids 230 kV transmission line project approved route
The Minnesota Public Utilities Commission
(MN PUC) granted a Route Permit for the Bemidji-Grand
Rapids 230 kilovolt (kV) transmission line
project on October 28, 2010. The MN PUC approved
a route that follows a combination of two route
alternatives proposed in the Route Permit application.
Construction began in mid 2011 and is expected to be complete in 2012..
Detailed aerial photo route maps: Click within a numbered box below (it will
highlight green) to download a detailed map as a PDF. Click
here for a high resolution overview map of the project.
|
|