Certificate of Need: Bemidji-Grand Rapids
The application for a
Certificate of Need for a 230-kV transmission line
and associated system connections from Bemidji to
Grand Rapids was filed with the Minnesota Public Utilities
Commission on March 17, 2008.
Seq |
Description of PDF file |
01 |
Cover
letter, Affidavit of Service, CON Distribution
List, Application for Certificate of Need |
02 |
Section
5 - Alternatives to Project; Section 6 - Alternative
Corridors; Section 7 - Application of Criteria |
03 |
Appendix
A: Project Development Agreement |
04 |
Appendix
B:
B1 - MPUC’s Notice Plan Order (Nov. 29, 2007)
B2 - Approved
Notices
B3 - MPUC’s Data Exemption Order (Dec. 24, 2007)
B4 - Summary
of Certificate of Need Filing |
05 |
Appendix
C:
C1 - Potential
Structure Types and Configurations for the Bemidji-Grand Rapids Line
C2 - Electric
Fields of Potential Structure Types and Configurations
C3 - Magnetic
Fields of Potential Structure Types and Configurations
C4 - Audible
Noise Levels of Potential Structures Types and Configurations |
06 |
Appendix
D:
D1 - Forecast Databases and Accuracy
D2 - Map of Load Centers in North Zone
D3 - Public Version of North Zone Coincident Winter
Peak Demand Forecast
D4 - Public Version of Bemidji Area Coincident Winter
Peak Demand Forecast
D5 - Public Version of Minnesota Portion of North Zone
Consumption Forecast |
07 |
Appendix
E:
E1 - The
Utilities’ Renewable Energy Generation (as of December
2006)
E2 - Renewable
Energy Retail Sales Forecast
E3 - Wind
Generation Required to Meet Minnesota’s RES
E4 - Wind
Generation Required Based on Minnesota’s Energy Savings
Goals |
08 |
Appendix
F: Potential for DSM/CIP to Reduce Project Need |
09 |
Appendix
G: Draft MacroCorridor Study |
10 |
Appendix
G, Figures 01-05 |
11 |
Appendix
G, Figures 06-07 |
12 |
Appendix
G, Figures 08-14 |
13 |
Appendix
G, Figures 15-21 |
14 |
Appendix
G, Figures 22-25 |
|