High voltage transmission and wind photos
CapX2020 owns the copyright for these photos. To obtain high resolution images please call (612) 330-7697 or e-mail info@capx2020.com . CapX2020 also asks that photos are attributed "Courtesy of CapX2020."
Preparing conductor for stringing on structures (5740)
345-kV single-pole single-circuit structure (8327)
345-kV single-pole single-circuit structure (8363)
Double circuit single pole self-weathering steel (9999)
Double circuit single pole transmission line
Single circuit single pole structure (1)
Two wind turbines in field
Unloading transmission poles from semi truck Installing spacer – close-up (09.07.2011)
Installing spacer (09.07.2011) Helicopter view – Go Pro (09.07.2011) Hanging from helicopter (09.07.2011) Flying with a block Pinning block Pinning close-up Overview with highway Overview with moon
Close-up overview Form welding Rebar welding Drill crane operation Tower foundation pur Structure sections First structure hwy 75 First structure
Foundation pour complete Structure erection Structure erection Corner structure construction Corner Structure Structures along highway 75 Corner Structure Corner Structure
Corner Structure Structures along highway 75 Structures along highway 75 Corner Structure Corner Structure Construction matting Installing upper section of tower 53 Securing structure segments
Structure base in wetland Structure erection on CapX Fargo project in Wildlife Management Area near Sauk Centre, MN in February 2013 Structure erection on CapX Fargo project in Wildlife Management Area near Sauk Centre, MN in February 2013 Structure erection on CapX Fargo project in Wildlife Management Area near Sauk Centre, MN in February 2013 Structure erection on CapX Fargo project in Wildlife Management Area near Sauk Centre, MN in February 2013 Implosive connector blast on CapX2020 project